Your 1 Stop Shop for all things solar! We specialize in residential solar panel installation, troubleshooting, maintenance, and cleaning, plus RV and off-grid solar systems. Reliable, efficient, and built to last. Power Wattz Solar has you covered!

Solar Experts

Kundan Green Energy Scales Renewable Portfolio Through 21.43/15 MW Captive Solar Project with Havells India

Power Wattz Solar | Off Grid Solar Solutions | Battery Backups > News > Solar > Kundan Green Energy Scales Renewable Portfolio Through 21.43/15 MW Captive Solar Project with Havells India
December 4, 2025 joeyxweber No Comments

Kundan Solar (Pali) Pvt. Ltd., a subsidiary of Kundan Green Energy, has announced a strategic partnership with Havells India Ltd., offering a 26% equity stake for the development of a 21.43/15 MW captive solar project in Rajasthan. The collaboration marks a significant step in Kundan Green Energy’s renewable expansion efforts and enhances its position as a preferred clean energy partner for industries across India.

Udit Garg, Managing Director of Kundan Green Energy, said the partnership reflects strong confidence in the company’s ability to deliver scalable and high-quality renewable infrastructure. “The 21.43 MW project strengthens our mission to support industries with reliable clean power, helping them reduce their carbon footprint, enhance energy security, and achieve long-term cost stability in their sustainability journey,” he noted.

Havells India welcomed the collaboration, stating that the investment aligns with its commitment to integrating clean and cost-efficient energy into its plant operations and supports its broader sustainability roadmap.

The project will be executed through a Special Purpose Vehicle (SPV), Kundan Solar (Pali) Pvt. Ltd., responsible for the design, development, installation, and long-term operations of the plant. With Havells participating both as a captive consumer and equity partner, the project gains additional technical and commercial strength, reinforcing its relevance in India’s growing renewable energy sector.

The total project investment of ₹72.5 crore will be deployed in phases based on key development milestones. The project is expected to be fully completed by May 31, 2026.

As the lead developer, Kundan Green Energy will manage the project end-to-end, including regulatory processes, site execution, and operational management. The company aims to deliver dependable renewable power with consistent performance and quality standards, supporting industrial growth while advancing sustainability and cost efficiency.


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.


Source link