Your 1 Stop Shop for all things solar! We specialize in residential solar panel installation, troubleshooting, maintenance, and cleaning, plus RV and off-grid solar systems. Reliable, efficient, and built to last. Power Wattz Solar has you covered!

Solar Experts

Voltage Energy releases two wiring solutions for PV projects

Power Wattz Solar | Off Grid Solar Solutions | Battery Backups > News > Solar > Voltage Energy releases two wiring solutions for PV projects
September 29, 2025 joeyxweber No Comments

The US-based electrical balance of systems provider stated its new products are designed for utility-scale projects and the mid-capacity range. Both systems are IP68-tested.


North Carolina’s provider of electrical balance of systems (EBOS), Voltage Energy, has launched two new pre-assembled wiring solutions for PV projects.

The Lynx product is engineered for utility-scale projects and high-power string applications, while the Ibex Plus is for the mid-capacity range.

“Our goal is not only to release new solutions, but to broaden the possibilities of pre-assembled EBOS solutions,” said the company. “Ibex Plus brings value-driven efficiency through flexible aluminum conductors, while new Lynx combines high current capacity with reduced voltage drop for large-scale applications.”

Lynx has a trunk capacity of up to 1250 MCM / 791 A, supporting branch cables of up to 4 AWG, and handling 90–95 A for large arrays. According to the company, it achieves 34% lower voltage drop compared with 500 MCM designs, especially suitable for projects with less than 1.5% voltage drop requirements.

The new Ibex Plus is designed for the mid-capacity range of 70–168 A, and is placed between standard harnesses and trunk bus systems. According to Voltage Energy, it has a 97% flexible aluminum structure that improves long-term reliability and installation ease. It utilizes a four-port configuration that supports any combination of copper or flexible aluminum conductors.

“Both Ibex Plus and Lynx have been developed with reference to the requirements of UL9703. Factory-assembled and IP68-tested, the systems minimize field terminations and human error,” the company stated. “By cutting labor time, reducing connection points, and ensuring long-term stability, they help EPCs and developers optimize both upfront CapEx and ongoing OpEx while meeting increasingly strict project timelines.”

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content


Source link

Share: