Oyster Renewable Energy has commissioned 39.3 MWp of a ₹372 crore wind-solar hybrid project for Laurus Labs in Andhra Pradesh. The solar facility will generate 51.51 MU annually and avoid 35,571 tonnes of emissions. A 21.6 MW wind component is due by December 2026, helping deliver 124 MU annually and support Laurus Labs’ 50% renewable-energy target by Q4 FY27.
The post Oyster Renewable Commissions 39.3 MWp Solar Project for Laurus Labs, 21.6 MW Wind Capacity Due by December 2026 appeared first on SolarQuarter.
Source link
